CampusAnswers

IRW131 — Reinforcing Post Tensioning

3 credits · 3 hours

Principles, theory, and terminology of post-tensioning. Stressing equipment, hand tools, document control. Installation of monostrand post-tensioned floor systems, tendons. Troubleshooting, encapsulated systems, barrier cables, slabs-on-ground, and field placement drawings.

Part of

Source ↗

← back to gateway catalog