CampusAnswers

HAC125 — Piping and Hydronics

3 credits · 3 hours

HAC 125 will provide the student with the background and skills to perform various piping operations pertinent to heating field. Topics to be covered include basic and specialty tools used for copper, black iron, copper-finned baseboard, and steam radiation. Piping layout, hydronic heating systems sizing, zoning, hot water and steam boiler piping, Hydronic controls and radiant heat layouts will be covered.

Prerequisites: HAC119

Part of

Source ↗

← back to lehighcarbon catalog